STT
Southern Tier TechCustomer Portal
Service • Estimates • Payments
WELCOME

Carroll Wade

Your service history, upcoming work, estimates and payment information in one place.

Current balance$0.00

Upcoming Jobs

Scheduled

80,000 BTU 96% High-Efficiency Gas Furnace Replacement: Remove and dispose of existing approximately 40- year-old furnace. Remove existing wood-boiler heat exchanger from duct system and modify existing ductwork as required for installation of new equipment. Furnish and install new 80,000 BTU, 96% AFUE highefficiency propane furnace. Installation includes connection to existing supply and return ductwork, required sheet-metal transitions, propane gas piping modifications, PVC intake/exhaust venting, condensate drain and condensate pump, electrical power connection, and thermostat/control wiring. Start and test new furnace, verify proper gas pressure, temperature rise, airflow, venting, condensate operation, and overall system operation. Price includes normal installation materials, removal of existing equipment, and job-site cleanup. Note: Existing propane piping will be evaluated for adequate capacity. Any major gas-line upgrades beyond the included installation scope will be discussed before additional work is performed.

2142 Hunter hill rd, Jasper, NY

Oct 2, 2026, 10:00 AM

Current / Open Jobs

Nothing here right now.

Estimates

AcceptedReplace furnace$7,500.00

Your Equipment

No equipment records yet.

Past Jobs & Receipts

Nothing here right now.