Carroll Wade
STT-34522106
Status
Scheduled
In Progress
Awaiting Closeout
Completed
Cancelled
Job type
Priority
Not set
Low
Normal
High
Emergency
Warranty job
Problem / requested work
80,000 BTU 96% High-Efficiency Gas Furnace Replacement: Remove and dispose of existing approximately 40- year-old furnace. Remove existing wood-boiler heat exchanger from duct system and modify existing ductwork as required for installation of new equipment. Furnish and install new 80,000 BTU, 96% AFUE highefficiency propane furnace. Installation includes connection to existing supply and return ductwork, required sheet-metal transitions, propane gas piping modifications, PVC intake/exhaust venting, condensate drain and condensate pump, electrical power connection, and thermostat/control wiring. Start and test new furnace, verify proper gas pressure, temperature rise, airflow, venting, condensate operation, and overall system operation. Price includes normal installation materials, removal of existing equipment, and job-site cleanup. Note: Existing propane piping will be evaluated for adequate capacity. Any major gas-line upgrades beyond the included installation scope will be discussed before additional work is performed.
Work performed
Technician notes
Next action
Estimate ($)
Amount billed ($)
Amount paid ($)
Save Changes