Carroll Wade
80,000 BTU 96% High-Efficiency Gas Furnace Replacement: Remove and dispose of existing approximately 40- year-old furnace. Remove existing wood-boiler heat exchanger from duct system and modify existing ductwork as required for installation of new equipment. Furnish and install new 80,000 BTU, 96% AFUE highefficiency propane furnace. Installation includes connection to existing supply and return ductwork, required sheet-metal transitions, propane gas piping modifications, PVC intake/exhaust venting, condensate drain and condensate pump, electrical power connection, and thermostat/control wiring. Start and test new furnace, verify proper gas pressure, temperature rise, airflow, venting, condensate operation, and overall system operation. Price includes normal installation materials, removal of existing equipment, and job-site cleanup. Note: Existing propane piping will be evaluated for adequate capacity. Any major gas-line upgrades beyond the included installation scope will be discussed before additional work is performed.
STT-34522106Job Time
Track every chunk of work — research, ordering, travel, onsite labor and paperwork.
Job
Customer
Carroll Wade
2142 Hunter hill rd, Jasper, NY
Service Location
2142 Hunter hill rd, Jasper, NY
Carroll Wade
Job Photos
Document conditions before, during and after the work.
After (0)
No after photos yet.
Work Notes
80,000 BTU 96% High-Efficiency Gas Furnace Replacement: Remove and dispose of existing approximately 40- year-old furnace. Remove existing wood-boiler heat exchanger from duct system and modify existing ductwork as required for installation of new equipment. Furnish and install new 80,000 BTU, 96% AFUE highefficiency propane furnace. Installation includes connection to existing supply and return ductwork, required sheet-metal transitions, propane gas piping modifications, PVC intake/exhaust venting, condensate drain and condensate pump, electrical power connection, and thermostat/control wiring. Start and test new furnace, verify proper gas pressure, temperature rise, airflow, venting, condensate operation, and overall system operation. Price includes normal installation materials, removal of existing equipment, and job-site cleanup. Note: Existing propane piping will be evaluated for adequate capacity. Any major gas-line upgrades beyond the included installation scope will be discussed before additional work is performed.
—
—
—
Financial
Enter the final amount billed before processing a payment.
Equipment
No equipment linked yet.
Parts Ordered
Track ordered parts, suppliers and expected arrival dates.
No parts ordered for this job.
Job Costs
Parts, materials and other direct job costs.
Job Closeout
Finish the field record before marking the job complete.


