Scheduled

Carroll Wade

80,000 BTU 96% High-Efficiency Gas Furnace Replacement: Remove and dispose of existing approximately 40- year-old furnace. Remove existing wood-boiler heat exchanger from duct system and modify existing ductwork as required for installation of new equipment. Furnish and install new 80,000 BTU, 96% AFUE highefficiency propane furnace. Installation includes connection to existing supply and return ductwork, required sheet-metal transitions, propane gas piping modifications, PVC intake/exhaust venting, condensate drain and condensate pump, electrical power connection, and thermostat/control wiring. Start and test new furnace, verify proper gas pressure, temperature rise, airflow, venting, condensate operation, and overall system operation. Price includes normal installation materials, removal of existing equipment, and job-site cleanup. Note: Existing propane piping will be evaluated for adequate capacity. Any major gas-line upgrades beyond the included installation scope will be discussed before additional work is performed.

STT-34522106
Edit JobDirections

Job Time

Track every chunk of work — research, ordering, travel, onsite labor and paperwork.

2.00 hr total
Total: 2.00 hr
Onsite WorkSep 21, 11:00 AM → Sep 21, 1:00 PMSite visit / parts lookup and ordering
2.00 hr

Job

ScheduleFri, Oct 2 · 10:00 AM–6:00 PM
Planned duration8 hr
TypeInstallation
PriorityNormal
SourceEstimate 3eccf1ba-5311-43af-adea-ad47f4930560
Warranty job—

Customer

Carroll Wade

6076610989

cwwade@frontier.com

2142 Hunter hill rd, Jasper, NY

Service Location

2142 Hunter hill rd, Jasper, NY

Carroll Wade

6076610989

Job Photos

Document conditions before, during and after the work.

Work Notes

Problem / requested work

80,000 BTU 96% High-Efficiency Gas Furnace Replacement: Remove and dispose of existing approximately 40- year-old furnace. Remove existing wood-boiler heat exchanger from duct system and modify existing ductwork as required for installation of new equipment. Furnish and install new 80,000 BTU, 96% AFUE highefficiency propane furnace. Installation includes connection to existing supply and return ductwork, required sheet-metal transitions, propane gas piping modifications, PVC intake/exhaust venting, condensate drain and condensate pump, electrical power connection, and thermostat/control wiring. Start and test new furnace, verify proper gas pressure, temperature rise, airflow, venting, condensate operation, and overall system operation. Price includes normal installation materials, removal of existing equipment, and job-site cleanup. Note: Existing propane piping will be evaluated for adequate capacity. Any major gas-line upgrades beyond the included installation scope will be discussed before additional work is performed.

Work performed

—

Technician notes

—

Next action

—

Financial

Townsquare price—
Estimate$7,500.00
Billed—
Paid—
Total labor time2.00 hr

Enter the final amount billed before processing a payment.

Equipment

No equipment linked yet.

Parts Ordered

Track ordered parts, suppliers and expected arrival dates.

No parts ordered for this job.

Job Costs

Parts, materials and other direct job costs.

+ Parts from Inventory
furnace, condensate pump, LP conversion kit, return air packageMaterial · ACIQ
Cost$2062.90Billed$0.00

Job Closeout

Finish the field record before marking the job complete.

All timers must be stopped first.