Jason dollarhide
PO JD-6172Upgrade Existing Gas Furnace to 96% High-Efficiency Furnace: Remove and dispose of the existing 80% gas furnace and install a new high-efficiency 96% AFUE gas furnace with ECM blower. Installation includes adapting the new furnace to the existing supply and return ductwork, reconnecting the existing gas, electrical, and thermostat wiring, and converting the existing metal-vented furnace installation to a high-efficiency direct-vent system. Includes: - New 96% AFUE high-efficiency gas furnace - Removal and disposal of existing furnace - Sheet-metal transitions and duct modifications as required - Gas piping connections - Electrical and thermostat connections - New PVC combustion air intake and exhaust venting to exterior - Condensate drain and condensate pump as required - Exterior vent terminations - Startup and operational testing - Verification of temperature rise and proper furnace operation Existing ductwork, gas piping, and electrical service are assumed to be serviceable unless otherwise noted. Any concealed deficiencies or additional work discovered during installation will be discussed with the customer before additional work is performed.
STT-36346172Job Time
Track every chunk of work — research, ordering, travel, onsite labor and paperwork.
No time recorded yet.
Job
Customer
Jason dollarhide
2661, Bailey Creek Road, City of Corning, Town of Corning, Steuben County, New York, 14830, United States
Service Location
2661, Bailey Creek Road, City of Corning, Town of Corning, Steuben County, New York, 14830, United States
Jason dollarhide
Job Photos
Document conditions before, during and after the work.
Before (0)
No before photos yet.
Work Notes
Upgrade Existing Gas Furnace to 96% High-Efficiency Furnace: Remove and dispose of the existing 80% gas furnace and install a new high-efficiency 96% AFUE gas furnace with ECM blower. Installation includes adapting the new furnace to the existing supply and return ductwork, reconnecting the existing gas, electrical, and thermostat wiring, and converting the existing metal-vented furnace installation to a high-efficiency direct-vent system. Includes: - New 96% AFUE high-efficiency gas furnace - Removal and disposal of existing furnace - Sheet-metal transitions and duct modifications as required - Gas piping connections - Electrical and thermostat connections - New PVC combustion air intake and exhaust venting to exterior - Condensate drain and condensate pump as required - Exterior vent terminations - Startup and operational testing - Verification of temperature rise and proper furnace operation Existing ductwork, gas piping, and electrical service are assumed to be serviceable unless otherwise noted. Any concealed deficiencies or additional work discovered during installation will be discussed with the customer before additional work is performed.
Installed new furnanxe
—
—
Financial
Customer-facing price uses billed amount first, then estimate, then Townsquare price. My cost includes both recorded Job Costs and the total cost of ordered parts.
Equipment
No equipment linked yet.
Parts / Materials
Estimate requirements, stock availability, ordering and arrivals.
No parts ordered for this job.
Job Costs
Parts, materials and other direct job costs.
PO / Purchase Ref: JD-6172
Job Closeout
Finish the field record before marking the job complete.