Jason dollarhide

PO JD-6172

Upgrade Existing Gas Furnace to 96% High-Efficiency Furnace: Remove and dispose of the existing 80% gas furnace and install a new high-efficiency 96% AFUE gas furnace with ECM blower. Installation includes adapting the new furnace to the existing supply and return ductwork, reconnecting the existing gas, electrical, and thermostat wiring, and converting the existing metal-vented furnace installation to a high-efficiency direct-vent system. Includes: - New 96% AFUE high-efficiency gas furnace - Removal and disposal of existing furnace - Sheet-metal transitions and duct modifications as required - Gas piping connections - Electrical and thermostat connections - New PVC combustion air intake and exhaust venting to exterior - Condensate drain and condensate pump as required - Exterior vent terminations - Startup and operational testing - Verification of temperature rise and proper furnace operation Existing ductwork, gas piping, and electrical service are assumed to be serviceable unless otherwise noted. Any concealed deficiencies or additional work discovered during installation will be discussed with the customer before additional work is performed.

STT-36346172

Job Time

Track every chunk of work — research, ordering, travel, onsite labor and paperwork.

0.00 hr total

No time recorded yet.

Job

Day 1Mon, Oct 19, 10:00 AM10 hr planned
Primary scheduleMon, Oct 19 · 10:00 AM–8:00 PM
Primary duration10 hr
TypeInstallation
PriorityNormal
SourceEstimate 6875a34d-e0be-402e-b44d-203952514875
PO / Purchase RefJD-6172
Warranty jobNo

Customer

Jason dollarhide

3072544944

2661, Bailey Creek Road, City of Corning, Town of Corning, Steuben County, New York, 14830, United States

Service Location

2661, Bailey Creek Road, City of Corning, Town of Corning, Steuben County, New York, 14830, United States

Jason dollarhide

3072544944

Job Photos

Document conditions before, during and after the work.

Work Notes

Problem / requested work

Upgrade Existing Gas Furnace to 96% High-Efficiency Furnace: Remove and dispose of the existing 80% gas furnace and install a new high-efficiency 96% AFUE gas furnace with ECM blower. Installation includes adapting the new furnace to the existing supply and return ductwork, reconnecting the existing gas, electrical, and thermostat wiring, and converting the existing metal-vented furnace installation to a high-efficiency direct-vent system. Includes: - New 96% AFUE high-efficiency gas furnace - Removal and disposal of existing furnace - Sheet-metal transitions and duct modifications as required - Gas piping connections - Electrical and thermostat connections - New PVC combustion air intake and exhaust venting to exterior - Condensate drain and condensate pump as required - Exterior vent terminations - Startup and operational testing - Verification of temperature rise and proper furnace operation Existing ductwork, gas piping, and electrical service are assumed to be serviceable unless otherwise noted. Any concealed deficiencies or additional work discovered during installation will be discussed with the customer before additional work is performed.

Work performed

Installed new furnanxe

Technician notes

—

Next action

—

Financial

My cost$2,616.28
Customer-facing price$6,525.00
Profit$3,908.72
Margin59.9%
Paid$6,525.00
Total labor time0.00 hr

Customer-facing price uses billed amount first, then estimate, then Townsquare price. My cost includes both recorded Job Costs and the total cost of ordered parts.

Balance Due$0.00
✓ Paid in full

Equipment

No equipment linked yet.

Parts / Materials

Estimate requirements, stock availability, ordering and arrivals.

No parts ordered for this job.

Job Costs

Parts, materials and other direct job costs.

PO / Purchase Ref: JD-6172

+ Parts from Inventory
Plumbing materials and condensate removal pumpMaterial · 0% markup
Cost$$321.28Billed$$321.28
Job costMaterials
Cost$$2295.00

Job Closeout

Finish the field record before marking the job complete.

All timers must be stopped first.