← DashboardAssessmentsEdit Estimate
SOUTHERN TIER TECH

Estimate

Replace furnace

Accepted$7,500.00
PREPARED FORCarroll Wade

2142 Hunter hill rd, Jasper, NY

ESTIMATE VALIDITY30 days

Estimate

80,000 BTU 96% High-Efficiency Gas Furnace ReplacementRemove and dispose of existing approximately 40- year-old furnace. Remove existing wood-boiler heat exchanger from duct system and modify existing ductwork as required for installation of new equipment. Furnish and install new 80,000 BTU, 96% AFUE highefficiency propane furnace. Installation includes connection to existing supply and return ductwork, required sheet-metal transitions, propane gas piping modifications, PVC intake/exhaust venting, condensate drain and condensate pump, electrical power connection, and thermostat/control wiring. Start and test new furnace, verify proper gas pressure, temperature rise, airflow, venting, condensate operation, and overall system operation. Price includes normal installation materials, removal of existing equipment, and job-site cleanup. Note: Existing propane piping will be evaluated for adequate capacity. Any major gas-line upgrades beyond the included installation scope will be discussed before additional work is performed.$7,500.00
Approved Total$7,500.00

Terms & Exclusions

Estimate valid for 30 days. Work outside the listed scope requires approval and may result in additional charges.